This plant contacted Moffitt to lower the temperature and decrease the heat strain on the plant equipment and personnel in the complex’s four powerhouses. The main condition of the project was that operations could not be disrupted during installation. That made pre-planning imperative for this project.
A new ventilation system was designed using computer modeling software. This allowed the team to gauge the effectiveness of the new system, and ensure sufficient air movement, before work began. The models showed that twenty-seven (27) MoffittVent™ ventilators would be required to move the large volume of stifling air.
The MoffittVent™ units, along with vents and new wall louvers for supply air, decreased the temperature in the Powerhouse by more than 30°. This improved worker comfort and allowed for the FGD scrubbers to clean the exhaust flue gasses more effectively. This contributed to an improvement in overall plant emissions.
Project Summary
Seven (7) low-profile natural ventilators
Twenty-Seven (27) low-profile ventilators
Two hundred thirty four (234) Pneumatic Wall Louvers
Need An Estimate
Our sales and design team will be happy to help you.